SVFD Station No. 8 Tiller Bay Addition - Spokane Valley

The Work consists of the following: 1. The work consists of construction of the Tiller Bay Addition to the existing Fire Station 8. The addition is approximately 586 square feet. 2. In general, work shall include, but may not be limited to selective demolition to existing exterior paving, walls and overhead doors (salvage to owner), new concrete apron and sidewalk, concrete masonry walls, interior concrete slab-on-grade, steel roof structure, steel roof deck, roof insulation, membrane roofing, scupper and downspout, four-fold apparatus bay doors, steel stair and rails, site utilities, and associated mechanical and electrical improvements. 3. The facility will remain occupied during construction. Work must be performed in Phases, as described in the Drawings, and access for apparatus must be maintained.
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Cover and Table of Contents 45.8 KB
02 - Advertisement for Bids 14.7 KB
03 - Division 00 - Procurement and Contracting Requirement 945.9 KB
04 - Division 01 - General Requirements 503.9 KB
05 - Division 02 - Existing Conditions 29.1 KB
06 - Division 03 - Concrete 152.9 KB
07 - Division 04 - Masonry 65.9 KB
08 - Division 05 - Metals 184.4 KB
09 - Division 06 - Wood, Plastics, and Composites 37.9 KB
10 - Division 07 - Thermal and Moisture Protection 139.9 KB
11 - Division 08 - Openings 37.5 KB
12 - Division 09 - Finishes 75.6 KB
13 - Division 21 - Fire Suppression 9.1 KB
14 - Division 31 - Earthwork 39.3 KB