SVFD Station No. 8 Tiller Bay Addition - Spokane Valley

The Work consists of the following: 1. The work consists of construction of the Tiller Bay Addition to the existing Fire Station 8. The addition is approximately 586 square feet. 2. In general, work shall include, but may not be limited to selective demolition to existing exterior paving, walls and overhead doors (salvage to owner), new concrete apron and sidewalk, concrete masonry walls, interior concrete slab-on-grade, steel roof structure, steel roof deck, roof insulation, membrane roofing, scupper and downspout, four-fold apparatus bay doors, steel stair and rails, site utilities, and associated mechanical and electrical improvements. 3. The facility will remain occupied during construction. Work must be performed in Phases, as described in the Drawings, and access for apparatus must be maintained.
Date Company Contact Bid Categories
1553101685
3/20/19 10:08 am
Associated Construction 2904 N Madelia
Spokane, WA 99207
Kathy Piraino
Tel: 509-489-0563
Fax: 509-489-0574
1. General Contractor
1553097640
3/20/19 9:00 am
Associated Construction 2904 N Madelia
Spokane, WA
Kathy Piraino
Tel: 509-489-0563
Fax: 509-489-0574
1553196274
3/21/19 12:24 pm
Modern Construction & Consulting Services 12904 E Nora Ave Suite A
Spokane Valley, WA 99216
Tuie Nguyen
Tel: 509-443-3337
1. General Contractor
1553100254
3/20/19 9:44 am
TW Clark Construction 1117 N Evergreen Road #1
Spokane, WA 99216
Cheri Long
Tel: 509-927-0800
Fax: 509-927-2600
1. General Contractor