SVFD Station No. 8 Tiller Bay Addition - Spokane Valley

The Work consists of the following: 1. The work consists of construction of the Tiller Bay Addition to the existing Fire Station 8. The addition is approximately 586 square feet. 2. In general, work shall include, but may not be limited to selective demolition to existing exterior paving, walls and overhead doors (salvage to owner), new concrete apron and sidewalk, concrete masonry walls, interior concrete slab-on-grade, steel roof structure, steel roof deck, roof insulation, membrane roofing, scupper and downspout, four-fold apparatus bay doors, steel stair and rails, site utilities, and associated mechanical and electrical improvements. 3. The facility will remain occupied during construction. Work must be performed in Phases, as described in the Drawings, and access for apparatus must be maintained.

Status

Bidding Closed

Prebid Date3/25/19 2:00 pm

Bid Date4/8/19 3:45 pm

Company & Contacts

ZBA Architecture

Bill Froemke, froemke@zbaarchitecture.com   (509) 456-8236

Location

Spokane Valley, WA

NOTE: Sealed bids will be received 2:00 p.m. thru 3:45 p.m. local time on Monday, the 8th day of April, 2019, and then publicly opened and read. Please review the ‘Advertisement for Bid’ for additional details.

Bidders may download electronic files at no cost. Printed documents are available by choosing the “Order” option. General Contractors may obtain one set of printed documents at no cost. All others are at “Bidders Expense”.

A Pre-Bid Meeting will be held on Monday, March 25, 2019, at 2:00 pm in the Fire Station No. 8 Conference Room, located at 2110 N. Wilbur Rd, Spokane Valley. Although this meeting is not mandatory, it is strongly advised that interested Contractors attend to obtain critical information about the project and bidding process.