CSML Food Bank & Distribution Center

In general, the work consists of the construction of a new distribution, office, and warehousing facility. Components of work include, but are not limited to; concrete work; pre-engineered metal building systems, wood stud partition framing, metal stud soffit framing, building insulation, metal roofing and wall panels, hollow metal doors and frames; wood doors, aluminum storefront systems; overhead sectional doors; glazing, door hardware; gypsum board; various interior floor, wall, and ceiling finishes; painting; edge-of-dock levelers; HVAC systems, plumbing systems, electrical power and lighting systems. Site work generally consists of utility work; rough and finish grading; asphalt and concrete paving; fencing and gates; site lighting; landscaping and irrigation.

Status

Bidding Closed

Prebid Date4/29/21 1:00 pm

Bid Date5/12/21 3:00 pm

Company & Contacts

ZBA Architecture

Bill Froemke - froemke@zbaarchitecture.com   509-456-8236

Location

Moses Lake

Project Estimate: $ 4,000,000.00.

Bidders may download electronic files at no cost. Printed Documents are available by choosing the “Order” option above. GC’s may receive printed documents at no cost. See “Ad for Bid” for instructions.

A Pre-Bid Meeting will be held on Thursday, April 29th, 2021, at 1:00 pm at the project site, 9299 NE Beacon Road, Moses Lake. Although this meeting is not mandatory, it is strongly advised that interested Contractors attend to obtain critical information about the project and bidding process.